CENTRAL UNIVERSITY OF PUNJAB
Full text
Related documents
Mechanical energy: is the total of potential and kinetic energy that is associated with the motion and position of a particle, or object. Reservoirs: These are the
Module 21 Role of Judiciary in Environmental Clearance Paper No: 12 Environmental Management.. Module: 21 Role of Judiciary in
SVRGRIHA Small Versatile Affordable Green Rating for Integrated Habitat Assessment CPCB: Central Pollution Control Board is statutory body established in under Water act, 1974
Objectives To learn about the concept of Green buildings Keywords LEED, IGBC, GRIHA, Green building.. Environmental
Baseline study– It entails the collection of detailed information and data on the condition of the project area prior to the project's implementation. Scoping: This
Segregate at the source all recyclable waste, as well as biomedical waste and industrial waste, to prevent special waste from being mixed with ordinary municipal
It reflects that depletion in groundwater resources and re- quirement of very high investments on electric motors adversely affected the access of small farmers to ground-
The Contractor shall be liable for full fidelity of the personnel to be provided and in case any pilferage/damage/theft/shortage is caused to the property of the University due to the