• No results found

Central Workshop

In document University of Hyderabad (Page 185-188)

Central Facilities

8.6 Central Workshop

The Central Workshop caters to a wide variety of fabrication and maintenance jobs of the University. It has four sections: Carpentry, Fabrication / Welding Sections, Machine shop and Painting and Polish Sections.

About 274+50 various indents of the University were completed during the financial year 2013 – 2014. In addition the following listed 30 Units Major works were taken-up by the Central Workshop and completed during the year 2013 – 2014. Total Works completed= 274+50+ 30 Major Units Works= 354 Nos. Total indents completed at Central Workshop.

Items produced in the Central Workshop include the laboratory furniture [special tables, trolleys, shelves etc], class room furniture [desks, black boards], office furniture [chairs, tables, book-shelves] and many others as per the needs of the users. Research requirements especially of the Science Schools and other departments involving the precision works were also met by the Science complex Workshop.

The brief review of the performance of the Central Workshop lists the Maintenance jobs completed, Capital items manufactured and fabrication and making of Research oriented jobs undertaken & Major Works undertaken for the period from 1-4-2013 to 31-3-2014.

The list of the completed works by the Central Workshop are:- 1. Maintenance Indents completed 274

2. Major Works Completed 30

3. Research Indents completed at Physics Workshop 50 --- Total Indents Completed = 354 ---

Maintenance works at the Science Complex, Lecture hall complex, Social Sciences, Humanities School, Library, S.N. School, South Campus Departments and various schools/Depts, fabrication works for Civil Engineering and Electrical engineering depts., and transport workshop also undertaken by the Central Workshop.

the following 25 Major Works were taken-up by the Central Workshop and completed during the year of Period from 1-4-2013 to 31-03-2014.

01. Manufacturing of Metal Radium Sign Boards trilanguages for Kendriya Vidyalaya at Main Gate, Near Post Office

& at Campus School- 6 Total Boards made at workshop.

On 16-04-2013………...…….Rs.33,500/- Budget Head:-“UWD-OTHER CHARGES”.

02. Manufacturing of Teak-wood frame Heavy Table of Size:- 7feetX3 ½ X 2 ½ feet Height – 1 with Cup-boards for Prof. K.C. James Raju, School of Physics to house the Excimer Laser.

On 18-04-2013………..……..Rs,22,000/- Budget Head:-DST-PURSE PROGRAMME”

03. Manufacturing of Plastic Dust Bins Metal Stands..10 Nos for Centre for Integrated Studies at central workshop.

On 14-05-2013………..………..Rs.26,500/- Budget Head:- “PART –II PLAN GRANT”

04. Manufacturing of Balance Boxes for School of Chemistry for Dr.V. Bhaskar Lab use purpose..

On 22-04-2013………..Rs.12,000/- Budget Head:- DST –SERB SCHOOL OF CHEMISTRY.

05. Manufacturing of Teakwood Lab Table of Size;-2ftX3ftX 3ft Ht ..1No and Teakwood Glass Box size: 2ftX3ftX 1 ½ ft ..1No for Prof. M.V. Rajashekar lab, for school of Chemistry.

On 30-04-2012……….………. Rs.22,000/- Budget Head:-School of Chemistry- Maintenance Grant.

06. Manufacturing of making Teak-wood frame glasses Notice Boards Size:- 6 feet X 3 feet .. 2 Nos one at South Campus Shopping Complex & one at Main Admin Building as directed by Registrar.

On 30-8-2013………...…..Rs.22,500/- Budget Head:- Registrar office and Other Charges”

07. Manufacturing & installation of Safety Metal Radium Boards .. 4 Nos of for Speed Breakers + 4 Nos for “Junction Ahead” Go Slow 4 Nos + Speed Limit 30 Kmph .. 4 Nos + “Do not Proceed Beyond This point” 6 nos + “Trespassers will be Prosecuted.. 4 Nos for South Campus as directed by the University Engineer- Total 22 nos sign boards.

On 04-09-2013………..…….Rs. 77,000/- Budget Head:- “UNDER CAMPUS DEVELOPMENT”

08. Manufacturing & installation of Metal Radium Board ..1 No. in three languages of Size:- 5feet X 3 feet X 10 feet Height—1 No for Chief proctor Office at Lake View Guest house & 5’X3’ Glass teak wood notice board for Chief Proctor Office Use.

On 12-90-2013………..…….Rs. 25,000/- Budget Head:- “CHIEF PROCTOR OFFICE FUND

09. Manufacturing of Sign Boards- 60 Nos. and polishing, painting works for furniture for Convocation etc works + Shifting of Dias/Tables etc from Campus to the Venue of Convocation.

On16-09-2013………..Rs.15,000/- Budget Head:-“ UWD-OTHER CHARGES.”

10. Manufacturing of Teak-wood frame Heavy Table of Size:- 7feetX3 feet X 32” Height – 1 with Cup-boards for Dr.

P. Ramu Sridhar, School of Chemistry

On 04-10-2013……….…………..Rs.18,000/- Budget Head:- School of Chemistry- Maintenance Grant.

11. Manufacturing a Glass Class Room writing Boards- of size:- 6feet X 4 feet..1No. and Size;- 6feetX3feet .. 4Nos total 5 nos for Campus School Principal at central workshop.

On 23-10-2013………Rs.35,500/- Budget Head:- Campus School –Maintenance Grant.

12. Manufacturing a Wooden Name Boards of size:- 9” X 15”.. 9 Nos for Centre for Neural and Cognitive Sciences in Bilingual for indicating the faculty offices etc at central workshop.

On 23-10-2013………Rs.3,500/- Budget Head:- Centre for Neural and Cognitive Sciences

13. Manufacturing & Installation of metal angle frame Door with frame for UE’s residence at open area for safety

14. Re-writing & Re-installation of Metal Radium Boards ..1 No. of Size:- 4feet X 5 feet X 10 feet Height—1 No.

for School of Mathematics & Statistics from School of Mathematics & Computer/Information Sciences- in tri languages at Science Complex.

On 12-11-2013………..…....Rs.9,000/- Budget Head:- UWD – Other Charges

15. Manufacturing of steel tubular frame with 18mm ply+ 1mm decolum top and a 18mm plywood cup-board ..10 Tables of size: 2feetXfeet X 2 ½ feet Height for Optometry & Vision Sciences [Refraction Lab] for School of Medical Sciences.

On 26-11-2013………..………..Rs.40,000/- Budget Head:- XII PLAN GRANST-2013-2014 REFRACTION LAB SCHOOL OF MEDICAL SCIENCES.

16. Taking up of the manufacturing of Notice Boards Size:- 72”X43”..1 No & 35”X43” ..1 No and Radium Stickers/

Logo etc for newly shifted Office of the NSS at near DWS premises.

On 8-12-2013………..……Rs.5,000/- Budget Head:- NSS CELL-Maintenance Grant.

17. Manufacturing, procurement & installation of Mild Steel Metal Dust Bins Stands at Various places on Campus as directed by the University Engineer.

On 13-12-2013………...………..…Rs.57,570/- Budget Head:-UWD –OTHER CHARGES.

18. Manufacturing of 18mm pre-laminate sheet board of size:- 8ftX 4ft.. 1 No. & 4ftX 3ft..1 No with radium letters boards to display the name of Dean and the Name of Ph.D. Scholars at School of Computer and Information Sciences as per Dean, SCIS indent letter No.UH/SCIS Dt.26/11/2013. Temporary Advance of Rs.9,500/- On 04-12-2013………..………Rs.9,500/-

Budget Head:- School of Computer and Information Sciences Budget.

19. Manufacturing & installation of Metal Radium Board ..1 No. bilingual for Horticulture department of Size:- 4feet X 3 feet X 10 feet Height—1 & re-painting of old boards 4 Nos. near Nursery Area- Letter from Asst..

Horticulturist is enclosed —Estimated amount Rs.10,000/-

On 20-12-2013……….………Rs.10,000/- Budget Head:-CAMPUS DEVELOPMENT FUND

20. Taking up of the re-painting & re-pasting of radium letters for School of Humanities in bilingual of Size:-4 ftX3ft..3 Boards in the School premises.

On 27-12-2013………..Rs.5,500/- Budget Head:- School of Humanities Budget

21. Taking up of the radium pasting of Admin Building Board of Size:- 8 ftX 4 ft X 6ft Height..1 nos with radium letters for display the departments in the Administration Building as directed by the Executive Engineer.

On 31 -12-2013………..Rs.5,000/- Budget Head:- CAMPUS DEVELOPMENT FUND

22. Taking up of the radium pasting of Sports Shooting Range Boards of Size:- 3 ft X 6 ft X 6ft Height..4 nos. & DST Auditorium Board Size:- 4 ftX 3 ft X 6 ft Ht..1 No with radium letters for display of the boards in connection with NAAC visit to University.

On 01-01-2014………...…Rs.11,500/- Budget Head:- CAMPUS DEVELOPMENT FUND

23. For taking up of the Health Centre Name Writing on the 3 Nos. walls at Health centre & to take up the manufacturing & Installation of class room white boards 2 Nos. of Size:- 6 ft X 3 ft & plain Notice Board of size:

8ft X 4ft..1 No for Director Centre for Comparative Literature, School of Humanities in connection with NAAC visit to University

On 06-01-2014………Rs.13,500/- Budget Head:- CAMPUS DEVELOPMENT FUND

24. For taking up of the manufacturing & installation of of Metal Sign Board of Size:- 2 ½ ft X 2 ½ ft X 10ft Height..2 nos. with radium letters for Office of the Health Centre/Sanitary Department to install near Academic Staff College premises –Visit of NAAC Committee

On 07-01 -2014………..Rs.8,500/- Budget Head:- CAMPUS DEVELOPMENT FUND

25. For taking up of the manufacturing & installation of Metal Sign Board of Size:- 2 ½ ftX 2 ft X 10ft Height..1 no.

with radium letters for Dean, Students’ Welfare in bilingual both sides to install near DSW office premises.

On 08-01-2014………...………... Rs.6,500/- Budget Head:- CAMPUS DEVELOPMENT FUND

26. For manufacturing & fixing of a Glass Sliding Notice Boards- of size:- 5feet X 3 feet.. 2Nos and Plain Cloth Notice Boards of Size;- 8feetX4feet .. 4Nos total 6 nos. for New Ladies’ Hostel-7 and New Men’s Hostel-L at South Campus.

On 05-02-2014………. Rs.23,000/- Budget Head: PART –I Maintenance -6 Hostels & Other Charges

27. For manufacturing & fixing of New Metal Radium Boards of Size: 4 feet X 3 feet X 10 ft.. Height ..4 Nos for New Ladies Hostel – 7 New Ladies Hostel – 8 for New Men’s Hostel ..K and L as the direction for Hostels at South Campus.

On 07-02-2014………Rs.35,000/- Budget Head: PART –I Maintenance -6 Hostels & Other Charges

28. For manufacturing of 15mm ply+1mm Decolum pressed Shoe Rack of Size: 4 ft long X 3ft Height X 1 ½ ft Depth with 3 Racks with Mesh Sliding Doors for Dean, School of Economics.

On 07-02-2014………..Rs.8,000/- Budget Head: Maintenance Grant of School of Economics.

29. For manufacturing & installation of metal Notice Boards ..2 Nos of Size: 4 ft X 8 ft X 9 ft Height at S.N. School premises for display/paste the notices/posters by the students use purpose.

On 10-02-2014……….Rs.28,000/- Budget Head: PART –I Maintenance -6 Hostels & Other Charges

30. For manufacturing & installation of metal Notice Boards ..2 Nos of Size: 4 ft X 8 ft X 9 ft Height at S.N. School premises for display/paste the notices/posters by the students use purpose.

On 20-02-2014……….Rs.24,500/- Budget Head:- Campus Development Fund.

Mohd. Yousufuddin is the Foreman of the Central Workshop.

In document University of Hyderabad (Page 185-188)