Infrastructure Development in DEI

( 2012 to 2019)

(2)

Women’s Hostel (Ground Floor)

Built - up Area 2128 sq.meters

Date of Completion 22.02.2012

Source of Funds UGC (XI Plan)

Completion Cost 129.17 lacs

(3)

Women's Hostel ( First Floor )

Built - up Area 1866 sq.meters

Date of Completion 28.02.2013

Source of Funds UGC (OBC)

Completion Cost 141.97 lacs

(4)

Work’s Department

Built - up Area 805.00 sq.meters

Date of Completion 28.02.2013

Source of Funds UGC (OBC)

Completion Cost 105.91 lacs

(5)

Extn. Of DES Block

Built - up Area 135.00 sq.meters

Date of Completion 30.12.2013

Source of Funds UGC (OBC)

Completion Cost 19.91 lacs

(6)

Extn. Of Library (Faculty of Engg.)

Built - up Area 380.00 sq.meters

Date of Completion 15.02.2014

Source of Funds UGC (OBC) and UGC (XII Plan ) Completion Cost 80.04 lacs

(7)

Seminar Hall Complex cum

Continuing Education Faculty Hostel

Built - up Area 1232.00 sq.meters Date of Completion 10.03.2014

Source of Funds UGC (OBC) and UGC (XI Plan) Completion Cost 367.56 lacs

(8)

Extn. Of Botany Department

Built - up Area 311.00 sq.meters

Date of Completion 20.03.2014

Source of Funds UGC (XI-Plan)

Completion Cost 40.01 lacs

(9)

Extn. Of Botany Department Building

(10)

Extn. Of Multimedia

Built - up Area 981.00 sq.meters

Date of Completion 31.08.2014

Source of Funds UGC (OBC)

Completion Cost 222.16 lacs

(11)

Extn. Of Multimedia Building

(12)

Information and Communication

Technology Building (Shatabdi Bhawan)

Built - up Area 1187.00 sq.meters

Date of Completion 22.08.2015

Source of Funds UGC (OBC) Completion Cost 209.87 lacs

(13)

Information and Communication

Technology Building

(14)

Multipurpose Gymnasium

• Built up Area - 702.00 sq.meters

• Date of Completion - 15.07.2019

Source of Funds - 1.0 crores (UGC)

Balance – own resources

Completion Cost – 145.58 lacs

(15)

Multipurpose Gymnasium

(16)

Bamboo Creche

Built - up Area 685.00 sq.meters

Date of Completion 31.03.2019

Source of Funds Non Govt. Grant Completion Cost 209.87 lacs

(17)

Bamboo Creche

(18)

Battery Room

Built - up Area 41.00 sq.meters

Date of Completion 31.03.2019

Source of Funds Solar Subsidy NEDA

• grant

Completion Cost 8.40 lacs

(19)

Battery Room

(20)

Miscellaneous Works

Ramps for the aid of handicapped and old persons have been added in all the buildings.

Water Harvesting wells have been provided at various low lying places which help in harvesting most of the rain water.

Roads of the Institute have been repaired and provided with a layer of premix Bituminous Carpet

Separate Toilet blocks for boys and girls have been provided in all the Faculties.

(21)

Ramps

(22)

Additions and Alterations

• Our earstwhile Tannery Complex having

covered area of 2697.00 sq.meters have been renovated with minor additions and

alterations. It now houses various departments like –

• Distance Education

• CART

• Footwear Technology

• Renewable Energy (under B Voc courses)

(23)

DEI Dairy

• Our old Dairy is revived now. It has been

completely renovated and augmented with modern machines.

(24)

DEI Dairy

References

Related documents

In Banwarilal Jhunjhun Vs Union Of India(1963), it was held that the expression ‘every distinct offence’ has a different content from the expression ‘every offence’ or

Following candidates have been short listed for the Written Test for appointment on the post of Chair Side Attendant, Faculty of

At some sites wherever incinerators have been provided or incinerators proposed to be installed, huge quantum of incinerable hazardous wastes (organic wastes) have been

The impacts of climate change are increasingly affecting the Horn of Africa, thereby amplifying pre-existing vulnerabilities such as food insecurity and political instability

Of the various water supply options that have been endorsed by the National Policy for Arsenic Mitigation of 2004 for use in arsenic-affected areas, deep tube wells emerged as

• Water harvesting is the capture, diversion, and storage of water obtained from different freshwater sources for plant irrigation,.. domestic purposes, industrial purposes,

(iii) In such areas, the existing and new users of ground water (both private and government) shall have to mandatorily adopt the area specific rain water

Table 3: Graph between Rate of accident vs Horizontal curve Table 4: Graph between Rate of accident vs Vertical grade Table 5: Graph between Rate of accident vs Superelevation