Analysis of Single Flow Line Multi Stage Multi-Product Pull Control Systems

G G Sastry1* and R Garg2

1,2 Department of Mechanical Engineering University of petroleum and Energy Studies, Dehradun 248006, Uttarakhand, India Received 21 December 2015; revised 20 August 2016; accepted 04 March 2017

The production control systems in industries become a significant pre-requisite for its success. The pull control systems could be a systematic approach for the effectiveness of production systems. This paper covers the investigation and performance analysis of Constant Work in Process (CONWIP), Kanban Control System (KCS) and Extended Kanban Control System (EKCS) using real time industrial problem. The industry manufactures two gears of different diameters and the demand for each is 20 per day. The CONWIP, KCS and EKCS are modeled as network diagrams in MATLAB- SIMULINK and simulated. The performance of EKCS is optimal as compared to KCS and CONWIP. The EKCS was implemented for one month and the production is increased by 54%.

Keywords: CONWIP, KCS, EKCS, Kanban, WIP, Average Waiting Time, Utilization, Demand Rate

Introduction

The modernized manufacturing sectors find a competitive environment for producing the products of distinguished quality and high perish ability. The competitiveness is the key requirement for the country’s growth and employment opportunities1. The industries follow make-to-order approach based on the customer demand2 as compared to make-to-stock approach which yields high inventory cost3. The multi-product pull control system works on dedicated and shared type of kanban system. The kanban is attached to each product independently in dedicated system whereas kanban is shared between the product types in shared system4. However, the determination of lot size and set up time is an important parameter for the selection of multi-product systems4. The shared kanban system shows superior performance as compared to dedicated kanban system8. The multi- product KCS processed on single manufacturing facility5 using decomposition method. It depends upon number of kanbans for computing the steady- state performance. The performance of hybrid system, which is the combination of pure push and pure pull system6, was analyzed. The pure push system was more significant as compared to pure pull system.

Also, the kanban systems are reviewed for design and operational systems7 and analyzed for other sequencing rules for the performance measurement.

The performance of multi-product, multi kanban with multiple demands are reviewed9, simulated and analyzed to optimize the inventory in real time10. A two moment parametric-decomposition-based analytical11 approach is used to measure throughput and mean queue length at individual stations for multi-product systems. The simulation results obtained using numerical values are compared. The optimal and meta-heuristic methods are developed to compute number of production kanban, withdrawal kanban and lot sizes in a supply chain system12. The performance of GASA is superior as compared to GA heuristic method. Gradient base heuristic methods are applied to GA for the design of multi-product kanban system14. The case studies are analyzed for number of kanbans and lot size for modified GA and classical GA. The performance of KCS, CONWIP and BSCS for multi-stage multi-product manufacturing systems are analyzed using simulation13. The Base stock system showed optimal performance for varying demand rate. In this paper, the performance of CONWIP, KCS and EKCS are compared using the simulation results and implementation of EKCS in the real industrial scenario.

Problem statement

The objective is to analyze the performance of the three pull production control systems; CONWIP, KCS and EKCS for single flow line multi stage multi- product system using industrial case study. The model is developed and simulated by using technical computing software as specified. The performance is

——————

*Author for Correspondence E-mail: ggsastry@gmail.com

(2)

analyzed for number of kanbans and breakdown to achieve optimized output. A small scale industry located at Ghaziabad India, with work force strength 15, is selected for investigation. The industry manufactures two Gears of different diameters, Gear A and Gear B. with sequence of operations viz. turning and generation; profiling; cleaning/ burnishing. The processing mean time for Gear A is 17 minutes, 10 minutes and 22 minutes and for Gear B is 20 minutes, 13 minutes and 18 minutes respectively. The expected demand for each gear type is 20 per day. The industry works for 6 days per week @ 16 hours per day.

Multi product system –model generation

Figure 1 illustrates the manufacturing system with two product types in three manufacturing stages MPi,

where i=1, 2, 3…. Queue pi

r is the output buffer of product type r, and stage i where r =1, 2 and i =1, 2, 3.

The finished product for each type is stored in the respective output queue. It synchronizes with the customer demand of the respective product type. The CONWIP, KCS and EKCS have three dynamic elements viz., product, demand and kanban (product authorization). The raw material or semi-finished product moves from upstream to downstream stage after processing and wait at the buffer of each stage.

The demand moves from the output of downstream stage to the input of upstream stage. Product authorization is the kanban fixed for each stage along with product type associated with it. The kanban moves with the part or demand or alone in each stage.

The dedicated kanban for stage i is synchronized with type ‘r’ product. The allocation of the product type

for each manufacturing stage is by specific rules depending on the batch size and availability of products in the buffer. The invariants of CONWIP system for one product consisting of kanban path are:

M (D1) M (P3A3) = 0

M (D1A1) + (MP1 + MP2 + MP3) + P3A3 = K 0 ≤ D1A1 ≤ K

0 ≤ [(MP1 + MP2 + MP3) + P3A3]≤ K

The KCS consisting of kanban in each stage imply the invariants for one product are:

M (D1Ai+1) M (PiAi) = 0 where i = 1, 2, 3...

M(D1Ai) +M(MPi) + M(PiAi) = Ki , where i =1,2,3..

0 ≤ MPi≤ Ki , where i = 1,2,3...

0 ≤ (MPi +PiAi) ≤ Ki , where i = 1, 2, 3…

0 ≤ PiAi≤ Si, where i = 1, 2, 3…

The invariants and characteristics of EKCS in each stage for one product are:

M (Ai+1) M (PiAi) M (D1) = 0 where i = 1, 2,3,... Ki≥ Si

M (Ai) + M (PiAi) + M (MPi) = Ki where i = 1, 2, 3,..

M (Ai) = Ki - Si, where i = 1,2,3, … 0 ≤ M (Ai) ≤ Ki, where i = 1,2,3, … 0 ≤ MPi≤ Ki, where i = 1,2,3, …

0 ≤ (MPi + PiAi) ≤ Ki, where i = 1,2,3, … M (PiAi) – D1≤ Si, where i = 1,2,3, … Results and Discussions

The developed models of CONWIP, KCS and EKCS are simulated for 5760 minutes (i.e. six days @ 16 hours) for demand rate of 2.5 to 3 parts per day

Fig.1—Qeuing Network diagram of single flow line multi stage multi-product system

(3)

(i.e. Demand mean time 20 minutes to 23 minutes).

The mean time between failures is 480 minutes and mean time to repair is 30 minutes. The performance is analyzed and compared for two, three and four kanbans per stage with and without considering the machine breakdown. The simulation results of Gear A and Gear B for 4 kanbans per stage are given in table 1. The production in CONWIP is less as compared to KCS and EKCS for the given input parameters. Hence, it was not considered for further analysis. However, the values of production and utilization in KCS and EKCS are similar at a demand rate of 2.72 parts per hour (i.e. demand mean time 22 min) for four kanbans per stage. Further, the WIP in EKCS is equal to or less than KCS. The average waiting time in EKCS is less as compared to KCS.

Hence, for the given input parameters and customer demand, the performance of EKCS is optimal as compared to KCS considering production, average waiting time, WIP and utilization.

Implementation of KCS and EKCS in Industry

The KCS and EKCS were implemented on the shop floor for two days each on experimental basis.

The data was recorded in real time considering the

warm up time and breakdown. The same input data was used in the network model developed as discussed earlier and simulated for 1920 minutes for each system. Table 2 gives the comparative performance based on the results obtained from simulation and shop floor. The production in EKCS was high as compared to KCS. The machine utilization and WIP in KCS was high as compared to EKCS. However, the WIP in KCS and EKCS shows similar variation between simulation and actual results. Therefore, considering production, WIP and machine utilization, the performance of EKCS is optimum at demand mean time 22 minutes.

Henceforth, EKCS was implemented for longer duration to analyze the performance.

Performance of EKCS in Industry

The EKCS was implemented in industry for one month and the results are recorded on weekly basis for optimum demand mean time 22 min i.e. 2.72 parts/hour. The batch size for each gear type is 21.

Simultaneously, with the same input data, the system was simulated for one month i.e. four weeks (24 days

@16 hours =23040 minutes). The simulation results and the real time output obtained after four weeks are

Table 1—Simulation results of single flow line multi stage multi product system for 4 kanbans per stage WITHOUT BREAKDOWN

Constant Work in process (CONWIP) Kanban Control System (KCS) Extended Kanban Control system (EKCS) Production AWT

(min)

WIP Utilizati on (%age)

Production AWT (Min)

WIP Utilizatio n (%age)

Production AWT (Min)

WIP Utilization (%age) Demand

Rate Parts/hour

A B A B A &

B A&B A B A B A &

B A & B A B A B A &

B A & B 3 98 94 102 109 8 71.4 149 129 216 99 12 94.25 148 133 28 43 9 92.3 2.85 123 82 73 124 8 73.6 139 132 261 100 10 92.5 138 136 31 19 5 91.3 2.72 123 82 73 124 8 76.38 139 136 261 102 8 93.65 138 133 33 22 6 90.2 2.61 123 82 105 101 8 70.35 127 126 320 246 11 89.68 126 120 19 19 7 84.4

WITH BREAKDOWN

3 94 95 103 105 7 68.94 149 122 188 104 10 92.07 145 129 62 53 11 90.4 2.85 94 95 105 108 7 69 139 131 190 102 11 92.52 138 132 61 29 7 90.4 2.72 94 94 104 106 7 68.5 139 129 207 107 10 91.69 136 132 53 29 9 88.58 2.61 94 94 107 101 7 69.65 127 126 292 218 12 89.26 123 117 44 33 13 83.61

Table 2—Performance comparison of KCS and EKCS with simulation results and actual results PRODUCTION

KCS Simulation KCS Actual EKCS Simulation EKCS Actual

A B A B A B A B

Demand mean time 22 min.

4 Kanban/stage

44 40 36 34 43 43 36 36

(4)

given in Table 3. The performance comparison of production, utilization and WIP respectively obtained by simulation, actuals before implementing the pull control system and actuals after implementation of EKCS are shown in figures 2 and 3.

Conclusions

The performance of CONWIP system, KCS and EKCS for single flow line multi stage multi-product system has been analyzed. Initially, the system was

analyzed on the basis of simulation results which indicate that the performance of KCS and EKCS is sensitive to part complexity, breakdown, average waiting time and WIP. The KCS and EKCS were implemented on the shop floor to evaluate the relative performance. The EKCS emerged best as compared to KCS on the basis of production, WIP and utilization.

Earlier, the industry was producing 12-13 gears of each type per day. After implementation of EKCS for one month, the production has increased from 20 to 21 gears of each type per day. Thus, the production has increased by approximately 54%. The WIP has decreased and machine utilization has shown significant improvement.

Acknowledgement

The author thanks Mr Sanjay Kohli, Managing Director, M/s Premier manufacturer’s pvt. Ltd for providing the case study and extending all the support and cooperation during the course of the work.

References

1 Rajiv K & S G Abhijit, Towards A Competitive Manufacturing Sector, Ind Council Res Int Econ Relation, (2008) 1-45.

2 Callagham R, System dynamic perspective on JIT system, Int Conf of the sys dyna society, (1986) 959-1003.

3 Sarker & J A Fitzsimmons, The performance of push and pull systems: a simulation and comparative study, Int J Prod Res, 27(10) (1989) 1715-1731.

4 Baynat B , JA Buzacott & Yves Dallery, Multi product Kanban Like control systems, Int J Prod Res, 40(16) (2002) 4225 -4255.

5 Krieg G & H Kuhn, A decomposition method for multi-product kanban systems with setup times and lost sales, IIE Transc 34(7) (2002) 613-625.

6 Krishnamurthy A & R Suri, Push can perform better than pull for flexible manufacturing systems with multiple products, Int J flex manufac, 16(2) 2004.

7 Erhun F, M S Akturk & A Turkcan, Interaction of design and operational parameters in periodic review kanban systems, Int J Prod Res, 41(14) (2003) 3315-3338.

8 Sachin, Performance evaluation of multi-product Kanban like control systems, Univ South Florida in Grad Sch (2004).

9 Surendra M Gupta, G Udomsawat & A T Yousef, Multi- Kanban Model For Multi-Product disassembly with Multiple Demands, II World Conf POM and 15th Annual POM Conference Cancun Mexico, (2004) 002-0273.

10 James C, G Dennis & WA Oliver, Kanban and Enterprise Resource Planning the True Understanding of Lean, Oliver Wight White Paper Ser (2007).

Table 3—Simulation and actual Results of EKCS

Production Work in Process Utilization (%age)

Simulation Actual Simulation Actual Simulation Actual

A B A B A & B A & B

4 Weeks @ 6 days per week

544 543 524 520 4 7 88.2 80 – 83

Fig.2—Performance comparison of EKCS in Industry for production

Fig.3—Performance Comparison and Analysis of EKCS in Industry for Utilization

(5)

11 Kumar S & A Krishnamurty, Performance evaluation of a multi-product system under CONWIP Control, IIE Transc 40 (2008) 252-264.

12 Widyadanaab G A, H M Wee & J Y Chang, Determining the optimal number of Kanbans in multi-products supply chain system, Int J Syst Sci, 41(2) (2010) 189 -201.

13 Rotaru A, Comparison between Tree Pull Control Systems : Kanban, CONWIP and Base Stock, Annals Oradea Univer, Volume 10 (20) (2011) 5267 - 5272.

14 Huang L, Multi-Product Kanban System Based on Modified Genetic Algorithm, Int conf inform Engg and app, (IEA), 219 ( 2013) 817-824.

References

Related documents

The design of column involving multi-component mixture in multi stage column demands the involvement of determination of temperature, pressure, steam flow rate, stream

Response of Three Tank non-interacting system is shown in figure below in which transfer function between level of third tank and input flow rate is calculated and

In this chapter, a novel multi-objective particle swarm optimization (MOPSO) technique is proposed and implemented for solving the flexible flow shop scheduling

First heat transfer rate in a simple micro channel for laminar flow model is studied and after heat transfer rate using single fin and multi- ple fins is analysed using laminar

3.7 Single Phase Grid Integrated Double Stage Solar PV Based PMSM Drive for Water Pumping With Unidirectional Power Flow

Polarized line formation in multi-level atomic systems, including the so-called partial frequency redistribution ( PRD ) mechanism in line scattering, is a theoretically

To effectively address multi-modal data, two different approaches have been explored in recent works viz. a) multi-generator model and b) single generator with multi- mode prior..

This is to certify that the thesis entitled “Performance Analysis and Power Allocation in Multi-Node Relaying Systems” being submitted by Kalpana Dhaka to the Department of