TENDER DOCUMENT

FOR

DESIGN, SUPPLY, ERECTION, COMMISSIONING AND TESTING

OF

GRID CONNECTED 4.0 MW SOLAR POWER PLANT HAVING FIVE YEARS O&M

FOR

CENTRAL COALFIELDS LIMITED, RANCHI

AT

GIRIDIH AREA

VOLUME – II [T [ TE EC CH H NI N IC CA AL L] ]

JANUARY, 2023

Central Mine Planning and Design Institute Ltd.

(A Subsidiary of Coal India Ltd.) Gondwana Place, Kanke Road,

Ranchi - 834031 (Jharkhand)

सीएमपीडीआई

cmpdi

A Mini Ratna Company

(2)

INDEX

Sl. No. Chapter Description Page No.

From To

1.0 Project Summarised Data 1

2.0 I Introduction 2 4

3.0 II Scope of Work 5 13

4.0 III System description 14 20

5.0 IV Technical Specification of Major Items 21 76

6.0 V Civil and Structural Works 77 105

7.0 VI Procedure for Plant Testing, Commissioning Performance Guarantee Test and Mandatory Spares

106 113

8.0 Drawings

(3)

TENDER DOCUMENT

FOR

DESIGN, SUPPLY, ERECTION, COMMISSIONING AND TESTING

OF

GRID CONNECTED 4.0 MW SOLAR POWER PLANT HAVING FIVE YEARS O&M

FOR

CENTRAL COALFIELDS LIMITED, RANCHI

AT

GIRIDIH AREA

(4)

Tender Document of 4.0 MW Ground Mounted Solar Power Plant CMPDI

1 Giridih Area, CCL

PROJECT SUMMARISED DATA Sl.

No.

Particulars Description

Ground Mounted Solar Power Plant- 4.0 MW (AC) Mono Crystalline

1. Owner of Project / Land Central Coalfields Limited

2. Location Near Truck Parking, Giridih

Area, CCL

3. Latitude-Longitude 24.1660 N – 86.2910 E 4. Total Land Area Available (approx.) 8.15 Hectare

5. Plant Capacity (AC) 4.0 MW

6. Nominal/system Power (DC) (Minimum) 5.2 MWp

7. PV Module (Min.) 535 Wp, Mono-PERC

8. No. of modules As per requirement

9. Inverter 1000 kW-4 nos.

10. CUF-AC 22.61 %

11. Performance Ratio (PR) 80%

12. Plant Life 25 Years

13. Operation & Maintenance of Plant 5 Years

14. Wind Speed 44 - 47 m/s

15. Seismic Zone Zone – III

16. Average Annual Precipitation 49.1 mm

17. Power Feeding Substation / Voltage 3x3MVA, Giridih Project Substation at 33kV Voltage Level

18. Project Distance from Substation 1.5 KM (Approx.)

19. Nearest Highway NH-114A

20. Nearest Railway Station Giridih Railway Station 21. Nearest Domestic Airport Deoghar Airport

(5)

Tender Document of 4.0 MW Ground Mounted Solar Power Plant CMPDI

2 Giridih Area, CCL

CHAPTER-I

INTRODUCTION

1.1 GENERAL

Central Coal Limited (CCL) has a number of projects which are spread in the state of Jharkhand. Geological Coal Reserves in CCL command area are up to 300m &

above depth. For administrative purpose there are seven operating coalfields in the command area of CCL. The company operates around 62 coal projects which include underground and opencast mine. Out of 62 operative mines around 40 mines are opencast mine and remaining UG mines. Additionally, 7 coal washeries, (5 Coking Coal and 2 Non-Coking Coal washeries) are running under administrative control of CCL.

To supply power to various projects and other power consuming centers of the project, a number of substations have been installed. Most of these substations receive power from DVC. Total contract demand of CCL is around 152MVA.

1.2 Grid connected solar power plant

A solar photovoltaic (PV) system is a renewable energy power generation technology that uses photovoltaic modules to generate electricity directly from solar radiation, using a phenomenon called the photovoltaic effect. The electricity generated can be stored, used directly, or fed back into grid. Solar PV is a reliable and clean source of electricity that can suit a wide range of power generation applications for residential, industrial, agricultural, etc. consumers. Some common applications include solar generation for captive consumption, power sale and savings in electricity costs.

A grid-connected solar power plant refers to a solar PV system that is connected to the local distribution grid. It is a form of distributed power generation. This system includes different components that are selected depending on the system type, site location and application. Generally, components of this system comprise PV modules, mounting structures, inverter, transformers and miscellaneous items like meters, junction box, cables, etc.

A grid-connected solar PV system has following main features:

 Electricity generation during daytime

 Low maintenance requirement

 Simple installation

 Easy scalability

 Robustness

 Low investment compared to stand alone system with battery backup.

References

Related documents

A single phase grid connected with a photovoltaic (PV) power system that will provide high voltage gain with state model analysis for the control of the system has

5.7 Battery Charge Controller (charging condition).. National Institute of Technology Rourkela Page 46 Proteus design of Battery Charge Controller is implemented on PCB as

Youn, “New maximum power point tracker using sliding-mode observer for estimation of solar array current in the grid-connected photovoltaic system,” IEEE Transactions on

This thesis deals with a techno-economic evaluation of decentralized solar photovoltaic (PV) systems for rural lighting applications. The studies presented in this thesis include i)

For crop drying, a hybrid photovoltaic (PV) integrated greenhouse (roof type even span) dryer has been designed and constructed at Solar Energy Park, Indian Institute of Technology

Table 6.1 Parameters of PV array used for simulation 108 Table 6.2 Simulation Values of Double Stage Three Phase Three Wire PV-UPQC 118 Table 6.3 Experimental Values of Double

The performances of MPPT algorithms, adaptive control techniques, online tuned PI controllers, are found satisfactory for all the features of the multifunctional

For crop drying, a Hybrid Photovoltaic (PV) Integrated Greenhouse (roof type even span) Dryer has been designed and constructed at Solar Energy Park, Indian Institute of