Sub: Report in compliancq of Hon'ble NGT Order dt 04.01.202? in OA No. 370 of 2021 Manoi,.Kumar Rai v/s State of Uttar Pradesh.
Sir,
Please refer to the subject noted above. Consequent upon the referenced Order, the designated Committee constituted has made sincere efforts in addressing all the
issues in compliance of the referenced Order. Report enclosed is integrated in two segments both of them are in general coherence for a major part of observation and recommendations, except
for a
few specific remarks submittedby
the District Administration Ballia.The Report with all supporting Annxeure is enclosed with request to kindly place before Hon'ble Tribunal.
Encl. As Above (zs
q4
Regional Officer
aM- \szr7
t
qf*q orqtf,q :
Sqrdq
"Eq-$qW qo cte, oTrurrlg
-
2760t01,www.uppcb.com. E-mail.roazamgarh@uppcb.com A.ff.
,16ffi
qre, rforft irt-r, dcFltr-zzloio # qurvr-zzzos2l, 2720681,27206s1,2720ss1ffm'
os22-272070+ # {-i-a : info@uppcb.com + iqsrq? : www.uppcb.comr
P"vige-d REPORT
PLACED BEFORE HON'BLE NATXONAL GREEN TRIBUNAL(NGT), NEW DELHI
OA No. 370 of 202L
in the matter of Manoj Kumar Rai V/s State of U.P.
0l.Background
Taking note
of
dischargeof
sewage and solid waste into Katahal drain connected to River Ganga in District.Ballia, U.P., Hon'ble NGT ordered on 04.01 .2A22. The verbatim of the relevant para of the order is mentioned below:').,...In view of above, a five-member
joint
Committee of NMCG, CPCB,Secretary, Urban Development Department, UP, State PCB and District Magistrate, Ballia needs to look into the matter and take remedial action
ta
ensure thatno
untreated sewage/waste goesto river
Ganga and erring afficers are made accountablefor
failures, if any found. The nodalagency
2 will be the
CPCBand Sfafe
PCBfor
coordination andcompliance...," '
.O2.Action Taken
In compliance of the referenced Order, efforts were made
to
constitute designated Committee.In
strict complianceof the
referenced Order,(virtual) meeting of nominated members comprising District Magistrate, Ballia and officers
of
Departmentof
Urban Development, UP; CPCB;NMCG and UPPCfrwas convened on Feb. 09, 2022. During the meeting, status of environmental issues in the subject arear knowledge sharing in the referenced matter, course of actioq taken/proposed by the concerned departments was discussed and schedule of on-site review was finalised.
NGT Report on Kathal Drain, Ballia; March 2022
A- kw
Page 1 of 10
Accordingly, on-site re.view by the joint team
at
Ballia was undertakenduring Feb 15-1G, 2OZZ, comprising of following members:
Nominated Members
1' Sh Ankur srivastava, Executive Engineer, U.p. Jal Nigam, Ballia (Rep of Secy, Urban Development, Up)
2. Sh Vivek Srivastava, CRO Ballia (Re-p of DM, Ballia)
3. Dr R.K.Singh, Regional Director, CPCB RD Lucknow
4. sh saumitra sen (Rep of Nominated Member, NMCG, New Delhi
5. sh Kalika singh, Regional officer (Ro), uppcts, R.o. Azamgarh
Other Members
1. Sh Dinesh Vishwakarma, EO, Nagar palika, Ballia
2. sh s.K. Barman, project Manager (R), u.p.lal Nigam Ballia
The Team carried out on-site surveillance visit to areas adjoining Kathal
Drain and various locations
in
Balliacity,
hereinafter referred as the"subject Area" and
interactedwith
representativesof
concerneddepartments. During on-site surveillance,
the
committee performed following activities:A. Interaction with local residents in the subject area B. survey of Kathal drain in its stretch in the subject area
c.
Visit to sites of bioremediation at Kathal Drain in the subject area D. visit to the confluence point of Kathal drain with R Ganga (Ballia) E. visit to identified location of (proposed) sewage Treatment plant atBallia
F. Visit
to
thd*siteof
legacy waste adjoining Kathal Drainin
the subject area.collection
of
sarnpleof
Kathal Drain and R. Gangaat
suitable locations,G.
NGT Report on Kathal Drain, Ballia; March Z0Z2
f\tt t
Page 2 of 10
Z
its for
*--*'-t .---,
{rtal
i form II::--*1
i
O3.Observations
A.
Sewage Management(i) As per
current estimate Nagar Palika Parishad Ballia with populationof
LO4424 as per 2011 census (125309 projected 2A?L) currently generates appx 13.53 MLD sewage(ii)
With no organized system of converTance, the sewage is discharged into Kathal drain through six nos of drains. Gharacteristics of Kathal dr"ain at different location in its stretch are appended as under:Location of sample Parametersa
pH Color DO BOD COD TSS Toti
Colifc Origin of Kathal drain
at Vill: Shahudeeh
7.65 15 4_7 3.8 1 2.96 74.6 I 4 Kathal Drain at
Bahdurpur
7.64 30 5.0 4.7 17.28 83,3
I
r50Kathal Drain at Rampur Mahawal
7.66 40 4.8 9,8 21.6 188.4
iia.s
-ibo
340(
"
Kathaldrain alc 430i Bendua Nalla
7.66 40 4.2 .11.2 35.02
Standard (Schedule-VI, E(P) Rules 1985)
5.5-9.0 30 250
)UU I I I
0000 I ___--tI
0000 I I I
0ooo II I
- -l* ---i I
;
l
-"__"1
UPrcB Monitoring dt 46.02.202
x Coliforrn in MPN /100 ml; all others except pH, in mg/l Note: alc : After confluence
Source .' Committee Maniloring dt 15/16.02.2422
x Coliform in MPN /100 ml; all others except pH, in mgll Note: alc : After confluence; b/c : Before confluence
*'- *.-- - '*-,.'.',"..,1I
Total 1
Coliform i
r rooooo- j
I I I
._*_*__"j
_t
Ili II
*-r !
ioooo---j
---*-"-1 500
ItI
i . --"__-- Il
Location of sample Parameters*
pH Color DO BOD COD TSS
Kathaldrain alc Bendua Nalla and b/c R. Ganga
8.09 30 3.2 13.6 42.4 198
Standard (Schedule-VI, E(P) Rules 1986)
5.5-9.0 30 250 100
R.Ganga alc Kathal
drain at Ballia ! 8.49 r0 8.41 6.12 28.6 49
Standard I
(DBU Class-B;
Outdoor bathing)
6.5-8.5 a 5.0 s 3.0
Source ; Committee o2
NGT Report on Kathal Drain, Ballia; March 2022
['"2 /-
Page 3 of 10
t, r
(iii) Results depicted Kathal drain and probable impact
above are indicative of high high content of coliform and due to domestic sewage
content of coliform in BOD in R. Ganga with
Fig- 1: Confluence of Kathal drain with R. Ganga at Ballia
(iv)
Nagar Palika Parishad Ballia has provided screens in the drains andthe sewage in drains is subjected
to
Bioremediation. However, the screens are not properly established and Bioremediation too has not been optimally designed to address entire flow of the drains.
Fig -2and Fig-3 depicts the
screensand system
provided forBioremediation in drains at Ballia
Fig-2: Screens introduced in Drains, Ballia
NGT Report on Kathal Orain, Ballia; March 2022
[vL
Page 4 of 10
f'; l
\,'t.{
$".;
t::
' !:r
;::'t:- . l i"*:.:
': .,1:r-ii i \.: .- ..i:.-
;..i.'-!: lil .-lI'- :tj r:.,.irr . .
:... l : :.'.::.1 -
it-atrluda it ie4or iLon€iruds 84.139763.
rElmsu$ni63.?&1 m Actur*cy:5 3 m 'Nete;01, htus drain Scs{rfj
'i:l
(v)
Fig- 3: Bioremediation process in Kathal Drain, Ballia
It
is noted that Sewerage work for Nagar Palika Parishad Ballia was prepared in the year (2008-09) by dividing its area into two Zones, namely City Zone and Civil Line Zone, on the basis of railway line passing through the middle of Baltia city.of 19.5 MLD) was conceptualized
in the year 2006 with its projected (vi) The STP of (cumulative capacity
for Nagar PaTifa Parishad Ballia capacity for 15 yrs.
(vii)
On a detailed review with representative was notedthat for
the construction ofNGT Report on Kathal Drain, Ballia; March 2022
of U.P.lal Nigam, Ballia
the STP referred above it
il,v i
Page 5 of 10
6
about 7 Hect. land. was required. The acquisition of land could not be completed and due to departmental procedural complexities, the work for development of land and establishment of STP could not be completed. Photograph of the proposed site of the STP taken during
the Committee on-site Review
on
15.A2.2A22 can further depict the current status. Refer Fig-4.Fig-4: Site
I
Status of proposed STP, Ballia(viii) It
is noted that as on date total 57 km sewerage system and 5.58Km rising main has been constructed (2008-09)
in
Nagar PalikaParishad Ballia. As per status presented by U.P.Jal Nigam, Ballia,
the existing sewerage system
is
capableof
handling 25.38 MLDSewage. However, since the sewerage system remained unutilized
for last 13 years, it shall requird cleaning
/
maintenance 1 repair of its structure, as per the case.(ix)
Other detail regarding activities planned and executed by U.P. lal Nigam, Ballia are summarized in Annexure A.B.
Management of SolidwasteThe Committee reviewed current practices for management of solid waste
in
the subject area. Based on status made available by the Executive Officer, fUagar palit&, Ballia, following observations have been made:*
.Nagar Palika Parishad, Ballia generates approximate55
TPD Solid Waste.NGTReport on Kathal Drain, Ballia; March 2022 Page 6 of 10
il.v i
v
i IWork for Solid Waste'Management in Nagar Palika Parishad Ballia was sanctioned under Urban Infrastructure Development Scheme (Urban Development, Govt of UP) for Small and Medium Towns (UID55MT) Scheme in 2008 at a Cost of Rs 681.56 Lakh
Nagar Palika Parishad Ballia Provided 4.5 Acre Land Against 9.5 Acre Land required for Project,
M/s A 2 Z Infrastructure Limited was 'authorized by the Construction
and
Design services (C&DS), UPlal
Nigam, - Azamgarh (WorkingOrganization)
by
Contracting M/s Accord HydroAir
PW. LTD as asecond Party for the purpose of speedy completion of the construction work.
Work on the facility started on L9.04,20L1 and 70 o/o work had been completed but due to dispute arising between the First Party and the Second Party, the Plant installation and other related Work could not be completed and has remained closed for since 9 years.
Subsequently Petition filed by Mls A2Z
in
High Court Allahabad the sole Arbitrator appointed by High Court has given decision in favor ofthe C&DS which has later cancelled contract with M/s A 2 Z due to
latter non-compliance and
is
currentlyin the
processof
executingremaining (30o/o) work,
As per
status made availableby
ProjectManager, C&DS Ballia the work shall be awarded latest by May 2022 with target date of completion by May 2023.
Other detail regarding activities plSnned and executed by Nagar.Palika Parishad, Ballia are summarized in Annexure B.
C. Management of legacy (Solid) waste
.
With no orEanised system for disposal and processing of legacy waste,the solidwaste generated
in
Nagar Palika Parishad Ballia is currently dumped on th*request of the local cultivators on their vacant tand at Mahavir Ghat. This location is adjoining Kathal drain appx 2 km before its confluence with R. Ganga. Nagar Palika Parishad Ballia entered into,
a land lease agreement with the local cultivators.NGT Report on Kathat Drain, Ballia; March 2022
twl
Page 7 of 10
I
on
initiative of swach Bharat Mission (swM) vide its communicationdt,
27.1t.2a2L, tender was invited by c&DSfor
disposalof
appx 3377L4.50 MT Legacy Waste by Bio-Remediation method.work
has since been awardedto M/s
BVGIndia
Limited pune, Maharastraon
05.01'.2022with
04.L2.2ozzas
completion date.currently the process of Installation of Machine and equipment is in process by Nagar Palika Parishad Ballia.
O5. Recommendations
Having made an indepth on-site review, scrutiny
of
records madeavailable, appraisal
of works
completedand
proposed, the committeeis of the
considered viewthat
insteadof
devising strategy to design and develop a separate system for managementof
sewage and solidwastein
Nagar palika parishad, Ballia, theexisting
provisionsand works partially
undertakenshall
beexpedited for execution to their optimum capacity and thus making use of expenditure incurred for its logical use. suggestive approach by the Committee is summarized as under :
Kathal drain
is
requiredto
be restored asa
connecting overflow channel of surha Taal, (a natural pond) near. Ballia city, leading to R.Ganga. This restoration can be achieved by operationalizing theexisting
laid
sewerage network and suitable treatment through establishing sewage Treatment plant at appropriate location.currently, with no system of organized sewage treatment functional
and sewage including faecal sludge. going into R, Ganga through
Kathal Drainn Nagar palika parishad, Ballia
t shall
optimize the process through engaginga
professional agencyto
execute the processof
bioremediationin all the
drains joining Kathal drain.Performance of the bioremediation shall be periodically monitoied
A.
B.
NGT Report on Kathal Drain, Ballia; March 2022
gtz I
Page 8 of 10
3
C.
and shortcomings'if any, shall be apprised
to
the Department of urban Development. The system of bioremediation be so designedthat all the drains meeting the recipient Kathal drain, are subjected
to
screening followedby
effective treatmentfor their
organic pollution load (BOD).in
orderto
eliminate possible dischargeof
fecal sludgein
open drains or sewerage, Nagar parika parishad, gaifia and u,p,Jal Nigamshall ensure
to
createa
feacal sludge treatment facilities as aninterim measure till, the upcoming
srp
redesigned to equip with co- Treatment facility for Feacal Sludge is established and functional at Ballia. The fecal sludge treatment facility may also be avaitable for future needs especially for nearby areas/
towns.since sewerage system for
a
major partof
inhabited area in the Nagarpalika Parishad, Ballia is established and remained unutilizedfor several years, U.P.lal Nigam shall ensure its functionalities by
further ensuring cleaning
/
repair of its slructure (if any), as per theCASE.
E. Department
of
Urban oeuutop*unt, Govtof
U.p. shall decisively interveneto
ensure that Nagar palika parishad, Ballia and u.p.lal Nigam work in close coordination so as to sort out issues regardingland
acquisition,transfer and notification for
. expeditiousestablishment
of
sewage Treatmentplant and
solidwasteprocessing facilities at Ballia.
F. since the srP 4 (cap 19.6 MLD) conceptualized in 2006 and planned
for
202! (ha#ng planned projectionof
15yr)
maynot
cater to future sewage generation, Department of Urban Development shall review the proposal for capacity enhancements of the above said upcomingsrP
based on projected sewage generation for next t 5-D.
NGT Report on Kathal Drain, Ballia; March 2022 Page 9 of 10
2A years
in
Nagar"Palil<t parisli*rj Dalliir."l-1.:r Ir!.i)firtr,rl ..lr,rii incol'p.Jlate and rrlilizetn
lhe tullc:St i|r r.cirrsi,J,,,riiliilr: II
!.,t t_;ji,.t.topr:graphy, gradrent arirl hiqh flood lcvcl of R. (:,;rrrrl.r 5C, 3s lt:
€{inlinate cllanc*s of t100din,,, utiliz* nat$rar gradient anei uririirr-,iz*:
pumping of sewage upto the S.l p.
\T--' Ayi,l,*L
(R K
Gupra)
(Dr.R.K.fingr,l
(r.v. Sinsh)sr w'M'speciarist, Regionar
nireltor
r:iltri.i Maciiii.i-.rri,:NMCG, New t-.rellr1^-dA {pdB, tuct
,,iri, '-"'i
,,,,,_- .r!vy uqr,x1e,,p61\ r-r-Lrr/ LuCKllOVr,
^ Ff."lliia
Pe*'*"c-n . ..ii
*,
\ (od'/1*pf r
'i $*o'
I*i,.:-'I-tf:t::.drivastava)
txarirrTIiJgr,l
f,le"cutiv€
Fngineer
Regional nftcerup Jai Nigam,
Ltailia
uf,pcB,vairnuii oirJlirr,,",€i"rnI
NGT Brport sn Kathal lll,ain" Eallia:,i\dar.ch i$lf ltrii.li: l.i.t rlf lir
t/
REPORT
PLACED BEFOR.E' HON,BLE NATIONAL GREEN TRIBUNAL(NGT), NEW DELHI
OA No. 370 of 2AZt
In the matter of Manoj Kumar Rai V/s State of U.p.
Ol.Background
Taking note
of
dischargeof
sewageand
solid wasteinto
Katahal drain connectedto
River Gangain
District Balia, U.p., Hon,ble NGT ordered on 04.01 .2022. The verbatlmof the
relevant paraof the
orderis
mentioned below:"...rn view
of
above,a
five-memberjoint
committeeof
NMCG, cpcB, secretary,urban
Development Department,up, sfafe pcB and
District Magistrate, Balia needs to look into the matter and take remedial action to ensurethat no
untreated sewage/waste goesto river
Ganga and erring officers are made accountable for failures,if
any found. The nodat agency 2 will be the GPCB and state pcB for coordination and compliance....,,O2.Action Taken
In
complianceof the
referenced Order, efforts were madeto
constitute designated Committee. In strict compliance of the referenced Order, (virtual) meetingof
nominated members comprising District Magistrate, Ballia and officers of Department of Urban Deveropment, Up; cpcB; NMCG ancl UppcB was convened on Feb. 09,2022. During the meeting, status of environmental issues in the subject area, knowledge sharing in the referenced matter, courseof action taken/proposed by the concerned departments was discussed and
schedule
of
o4-site * review was finalised. Accordingly, on-site review by the joint team at Ballia was undertakenduring
Feb 15-16, 2022, comprising of following members:NGTReport on Kathal Drain, Baltia; Feb.ZO2Z
?
Page 1 of 11
lz
Nominated Members
1. Sh Vivek Kumar Srivastava, CRO Ballia (Rep of DM, Balia)
2.
Dr R.K.Singh, Regional Director, CPCB RD Lucknow3. Sh Saumitra Sen, Coordinator, NMCG, New Delhi
4.
sh Kalika singh,. Regional officer (Ro), uppcB, R.o. Azamgarh5. Sh Ankur Srivastava, Executive Engineer, U.P. Jal Nigam, Ballia (Rep of Secy, Urban Development, Up)
Other Merhbers
1. Sh Dinesh Vishwakarma, EO, Nagar palika, Ballia
The Team carried out on-site surveillance visit
to
areas adjoining Kathal Drain and various locations in Ballia city, hereinafter referred as the ..Subject Area" and interacted with representatives of concerned departments. During on-site surveillance, the committee performed following activities:A. Interaction with local residents in the subject area B. survey of Kathal drain in its stretch in the subject area
C. Visit to sites of bioremediation at Kathal Drain in the subject area D. Visit to the confluence point of Kathal drain with River Ganga (Ballia) E. Visit
to
identified locationbf
lproposed) Sewage Treatment plant atBallia
F. Collection
of
sampleof
Kathal Drainand
River Gangaat
suitable tocations.O3.Observations
A.
Sewage Management(i)
As per ciihrent estimate Nagar Palika Parishad Ballia with its populationof
L04424 as per 2011 census (125309 projectedfor
2O2L) currengy generates appx 13.53 MLD sewaged,
NGT Report on Kathal Draln, Ballia; Feb. 2022
?
Page 2 of 11'l
i
l3
(ii)
With no organized system of conveyance, the sewage is discharged into Kathal drain through six nos of drains. Characteristics of Kathal drain at different location in its stretch are appended as under:Location
ofsarnple
Parameters*
pH Color DO BOD coD TSS Total
Coliform
Origin
of
Kathaldrain at
Vill:Shahudeeh
7.65 15 4.7 3.8 L2.96 74.6 4500
Kathal
Drain
at Bahdurpur7.64 30 5.0 4.7 L7.28 83.3 1600000
Kathal
Drain
at Rampur Mahawal7.66 40 4.8 9.8 2L.6 188.4 3400000
Kathaldrain a/c Bendua Nalla
7.66 40 4.2 LL.2 35.02 216.5 4300000
Standard (Schedule-VI, E(P) Rules 1986)
5.5-9.0 30 250 100
: UPPCB Monltorino Mgnltoringdt 06.02.2022
x Coliform in MPN /100 ml; all others except pH, in mg/l Note: a/c : Rfter confluence
Location sample
of Parameters*
pH Color DO BOD coD TSS Total
Coliform
Kathaldrain alc Bendua Nalla and b/c River Ganga
8.09 30 3.2 13.6 42.4 198 1100000
Standard (Schedule-VI, E(P) Rules 1986)
5.5-9.0 30 250 100
RiverGanga a/c Kathal
' drain
at Ballia8.49 10 8.41 6,12 28.6 49 130000
Standard (DBU Class-B;
Outdoor bathinq)
6.5-8.5 >5.0 <3.0 500
Source : Committee Monittring dt 15/16.02.2022
x Coliform in MPN /100 ml; all others except pH, in mg/l Note: a/c : After confluencel b/c : Before confluence
NGT Report on Kathal Drain, Ballla; Feb.2022
I
Page 3 of 11
tq
(iii)
Results depicted aboveare
indicativeof
high contentof
coliform in Kathal drain as also in River Ganga with probable impact due to domestic sewage.Fig- 1: Confluence of Kathal drain with River Ganga at Ballia
(iv)
Nagar Palika Parishad Ballia has provided screens in the drains and the sewage in drains is subjected to Bioremediation. Fig -2 and Fig-3 depicts the screens and system provided for Bioremediation in drains at BalliaFig-2: Screens introduced in Drains, Batlia
NGT Report on Kathal Drain, Ballia; Feb.2O22
Z.- ----
Page 4 of 11
ts:
Fig-3: Bioremediation process in Kathal Drain, Ballia
(v) It is
notedthat
proposalfor
Sewerage workfor
the domainof
NagarPalika Parishad Ballia was prepared in the year (2008-09) by dividing its area into two Zones, namely City Zone and Civil Line Zone, on the basis of railway line passing through the middle of Ballia c[ty.
(vi)
The STPof
(cumulative capacityof
19.6 MLD) was conceptualized for Nagar Patika Parishad Ballia in the year 2006 with its projected capacity for 15 yrs.l(vii)
On a detailed review with representative of U.P. Jal Nigam, Ballia it was noted that for the construction of the STP referred above, the acquisitionNGT Report on Kathal Drain, Ballia; Feb.2022
$, 3
/ PaBe 5 of 11t(
of land has been_ completed in Jan 2Ot6, after which the construction of work has been started. Photograph of the proposed site of the STp taken during the Committee on-site Review on 15.02 .2OZZ can further depict the current status. Refer Fig-4.
Fig-4: Site
/
Status of proposed STp, Ballia(viii) It
is noted that as on date total 57 km sewerage system and 5.6g Km rising main has been constructed (2008-09) in the area of Nagar palika Parishad Ballia. As per status presentedby
U.p:Jal Nigam, Ba1ia, the existing sewerage systemis
capabreof
handring 25.38 MLD Sewage.However, since
the
sewerage system remained unutilizedfor last
13years, it shall require cleaning
/
maintenance/
repair of its structure, as per the case.B.
Management of SolidwasteThe Committee reviewed current practices
for
managementof
solid waste in the'subject area. Based on status made available by the Executiveofficer, Nagar palika, Ballia, following observations have been made:
'
Nagar Patifta Parishad, Ballia generates approximate55
TpD Solid Waste.NGT Report on Kathal Drain, Ballla; Feb.2022
Page 6 of 11
'
Work for Solid Waste Management in Nagar Palika parishad Baltia wassanctioned
under
Urban Infrastructure Development Scheme (UrbanDevelopment, Govt
of up) for
Smalland
Medium Towns (UIDSSMT) Scheme in 2008 at a Cost of Rs 691.66 Lakh'
M/s A2 Z
Infrastructure Limited was authorized by the Constructionand
Design services(c&DS), up Jal Nigam,
Azamgarh (working organization) by contracting M/s Accord Hydro Airpw.
LTD as a secondParty for the purpose of speedy completion of the construction work.
o
'Work on the facility started on 19.04.2011 and 70 o/o work had been completedbut
dueto
dispute arising betweenthe
First party and the Second Party, the Plant installation and other related Work coutd not be completed and has remained closed for since 9 years.'
Subsequently Petition filed by Mls A2Z in High Court Allahabad the sole Arbitrator appointed by High Court has given decision in favor of the C&DS.Mls A2Z has appealed in High which against the arbitration, which is still pending. Meanwhile,
on the
basisof
arbitration order, c&DSis in
the process of cancelling the contract with M/sA2
Z and preparing DRp for the remaining works.05. Recommendations
Having made
an in
depth on-site review, scrutinyof
records made available, appraisal of works compteted and proposed, the committee isof the considered view that instead of devising str"ategy
to
design and develop a separate system for management of sewage and solid waste in Nagar Palika: Parishad, Ballia, the existing provisions and works partially undertaken shall be expedited for executionto
their optimum capacity9nd
thus'imakinguse of
expenditure incurredfor its
logical use.Suggestive approach by the committee is summarized as under:
q
NGT Report on Kathal Drain, Ballia; Feb. 2022
&
Page 7 of 11rc
A. Kathal drain is required to be restored as a connecting overflow channel
of Surha Taal, (a natural pond) near Ballia city, leading to River Ganga.
This restoration can
be
achievedby
interceptingall the (six)
drainsjoining the Kathal drain and subject them to suitable treatment through establishing Sewage Treatment Plant, process of which already initiated.
B. Currently, with no system of organized sewage treatment functional, and
the
sewage including faecal sludge goinginto
River Ganga through Kathal Nala, the existing system of bioremediation in drains falling into Kathal Nala, Nagar Palika Parishad, Ballia shatl optimize the process of Bioremediation. They may consulta
professional agencyto
design and executethe
processof
bioremediationin all the
drains joining Kathal drain. Performance of the bioremediation shall be periodically monitored along with Third party monitoring agency and shortcomings if any, shall be apprisedto
the Department of Urban Development, U.p. for further remediat measures. The system of bioremediation be so designed that allthe drains meeting the recipient Kathal drain, are subjected to screening fotlowed by effective treatment for their organic pollution load (BOD).
C. Since sewerage system for a major part of inhabited area in the Nagar Palika Parishad, Ballia is estabtished and remained unutilized for severat
years, U;P.Jal Nigam shall Lnsure its functionalities by further ensuring cleaning
/
iepair of its structure (if any), as per the case.D. For
the
purposeof
unsewered inhabitedarea in the
Nagar palika Parishad, Ballia,u.P. Jal
Nigamshall
prepare project proposal for sewerage system, interception recipient drain and sewage treatment of an adequate capacity.E. Since the STP (Cap 19.6 MLD) conceptualized
in
2006 and planned for 2021(having ptanned projection of 15 yr) may not cater to future sewagegeneratidh, Dept
of
Urban Development shall reviewthe
proposal for capacity enhancements of STP based on projected sewage generation for next 15-20 yearsin
Nagar Palika Parishad, Batlia. The proposal shallincorporate
and utilize to the fullest in
considerationof
terrain,Page
9,_
NGT Report on Xathal Draln, Ballia; Feb.2022 8of11
dopograpilry, gradient
*O ttgh
flood tevelof
River Gangaso
as to eliminate chances of,f
STP,utilize
natural gradient .and$e
STP.minimize ptirfiSfiS
#.
/
". (suttl&
g$n)C.oordindor, NMCG
New Delhi (Df, Regional CrcB, R. K, .3Lucknow
Director glngh)
District"k .
BalliaMagistrate ;;l "ilI .ck)-
(anxuMhnstava)
E:{es$i\re Engineer uP }el f'lfgem(Urban)
(Kalika SinEh)
Regional Officer
UPPCB Varanasi
. ''eonbwction Division U.P Jaf N$arn, tsallia
iifl
[.
F
ii
pageg of lt
2o
j
Annexure
Sewerage System
in
Nagarpalika parishad,
BalliaStatus works completed I
proposedIn order to develop sewage treatment plant for Nagar Palika Parishad, Ballia, the government issued an extraordinary gazetter for land acquisition on date t8/L2/2O09 near Amritpali, but due
to
non-acquistion of the entire land, the construction couldn't be started at the said site. For the work in question, on the basis of circle rates published by District Magistrate, government issued order vide order number 4571/}-5-20L5-272SA-2013 dated 16.11.2015, to purchase land in Chudhar village & the formalitiesto
purchase land has been completed by January, 2016. On the basis of availability of 0.948 hectares ofland
purchased,in the
meetingof
Regionat Tender Committeeheld
on L6.A7,2A15, decision has been takento
amalgamate both STPs & constructSTP of capacity 19.5 MLD with SBR technology. On this basis revised estimate
of
Rs 63.32 crore was sent bythis
office on 05.07.2016 under state sectorand
revised estimateof
Rs94.53
crore under UIDSSMT was sentto
the governmentbut
since UIDSSMT programme has been terminatedby
the governmentand
unavailabilityof funds in state sector, both the
above estimates could not be approved. After this, dueto
increase in material and labour rates again under the state sector the estimate of Rs. 1t2.7536 crores was revised and sent. After this the estimate Rs. 167.40 send officeof
the Chief Engineer (Nagar) UP Jal Nigam, Lucknow on dated L7.O7.2A19. which issent
to
the Chief Engineer(PPBRD) Up:al
Nigam, Lucknow for appraisal, butthe
said estimate wasnot
accepted dueto the
unavoidable reasons. On31.05.2019
the
Hon'ble Highcouft
prayagraj has stayedon any type
of constructionat
Bedua Pumping Station, constructed under state sector, till future orders in the events of a dispute on the land provided by Nagar palika Parishad Ballia.Since the approval
to
construct one STP by merging the capacity of both the STPs was not received bythe
government, therefore,in the
meeting oflal Nigam Board on
25.06.2A20 decisionhas been given to abolish
theconstruction till thebpproval against revised estimate has been sanctioned by the government. In compliance of the above,
the
revised estimate was sent by Chief Engineer (Varanasi),UP Jal Nigam, Varanasion
dated 10.08.2020Annexure{UP Jal Nigam, Ballia) Page 1 of 2
zl
framing the amount of Rs.139.82 crore under the state sector, which was not approved
due to
unavoidable reasons, Againan
estimate amounting to ZO0.2g crore underthe
Namami Gange scheme wassent on
30.09.2020 through Chief Engineer (Ganga), UP Jal Nigam, Lucknow to Additional Project Director, State Sanitation Ganga Mission,
Lucknow on which objection was raisedon
04.03.2021.After
disposingoff the
objectionsraised,
revised estimateamount of Rs
2O4.L7crore was sent on
14.05.2021to
ChiefEngineer(Ganga), U P
lal
Nigam, Lucknow. Vide Notification no. L77Al9-3-2t-OSCIZA21
dated
09-09-2021, UPlal
Nigamhas
been dividedinto
Uttar'
pradesh Jal Nigam(Urban) and Uttar Pradesh Jal Nigam(Rural). In accordanceto
which,the
work retatedto
Namami Gange Programme isto
be done byProject
Manager,Uttar
Pradeshlal Nigam (Rural)
Varanasi.On
Date19.02.2022 after consultations
with the
higher officers decision has been taken to prepare revised estimate of works making conditional assessment of the already constructed works under the AMRUT 2.0 programme.To carry the household sewage emitted from the houses of Nagar Palika Parishad, Ballia in
the
sewer line,the
Scheme of Sewage House connection has been approvedby
governmentvide order No.
299/20L69-5-2015-81 budget/2016 dated 18.10.2015 under the AMRUT programme.In
the above scheme, 7LTL nos. house connecting chambers hasto be
constructed. At present 4868 nos. house connecting chambers have been made under the abovesaid scheme. After construction & commissioningof
STP, these house connecting chamberswill be
connectedto the
houses and sewagewill
betreated
in
STP. Then no domestic sewagewill
flowin
River Ganqa throughKathal
Nala.
t\\\
l\^|N
(Date, SigVand StamP) Authorized Signatory
t
EkleBCBbffip6"palia
Construction Division U.P Jal Nigam, Batlia
Annexure{UP Jal Nigam, Ballia) Page 2 of 2
I
z 2-_-
r
o o
Annexure-B
SOIID WASTE MANAGEMENT STATUS REPORT NAGAR PATIKA PARISHAD, BALTIA
Solid Waste Management Work in Nagar Palika Parishad Ballia sanctioned under URBAN INFRASTRUCTURE DEVELOPMENT SCHEME FOR SMALL AND MEDIUM TOWNS (ulDSsMT) scheme in 2008. sanctioned cost of Project was Rs 681.66 Lakh
Nagar Palika Parishad Ballia Provided 4.5 Acre Land Against 9.5 Acre Land required for
Project.
Solid Waste Generated in Nagar Palika Parishad, Ballia is approximate 55 TPD.
A TO Z lnfrastructure Limited was authorized by the Working Organization Construction and Design services, UP Jal Nigam Azamgarh by Contracting Accord Hydro air pW. LTD as
a second Party for the purpose of speedy completion of the construction work.
Work has been started on 19.04.2011 and 70 % work had been compteted but due to dispute arising between the First Party and the Second Party, the Plant installation and other related Work has been completely closed since 9 years.
Regarding the Petition organized by the Ferm in High Court Allahabad the sole Arbitrator appointed by High Court has been given in favor of the department.
By Letter No. 177 of Chief General Manager (lll) dated 15.10.2020 the Ferm has been given Status forTermination of Contract Agreement.
Next Hearing has been fixed on L7.A2,2A22 .
The DPR of Pending work has been Prepared by Construction and Design services, Up Jal Nigam Azamgarh. After approval of DPR of Pending work remaining work will complete
as soon as
possible.
,a o
14-
€,a!
Annexure-B (NPP Ballia) Page 1 of 2
23
Legacy Waste Treatment Status Npp Ballia
o
52TPD solid waste Generate in Nagar palika parishad, Ballia.o
The garbage coming out of the city area is dumped on the request of the cultivators on their vacant pit land at Mahavir e hat by th" N.;;;palika parishad errii,f;i;;" ""
'
ln compliance of Additional mission Director sBM Letter no. 33 dated 27,L1.2a2L, tender was invitedby
Working organization Construction and Desig;;;;;Gl;i
Nigam 22.12.2021and financiat Azamgarh for the dispolar bid on 2g.tZ.ZA2t.oi r"gr.y
*rti.
*nor"t..r,ii.d;J;;;ffi ;;
' l"lltt,was
invitedfor
3377t4.50 MT Legacy waste Disposal by Bio-Remediation metnod.o
work has been awarded to BVG lndia Limited Pune, Maharastra on 05.01.2022 atl:19:t-cost 1519 -72 t;,kh by working organization
constrr.iioi.iJ r.r,u, ,"r,..r,
UP Jal Nigam Azamgarh and completion date will be
04.12.20;;.
--'e" --' -'a-r'r
ln compliance of construction and Design services, Up Jal Nigam fuamgarh Letter No.48lsotid waste/o2 Dated
tl.ot.zoi: i"J;;;'rrni-nl.'r
r;g]-J,,,' waste site for lnstallation of Machine and.qripr.nt
is in process by Nagar palika parishad Ballia.9L
(Date, Sign and Stamp) .Authorized Signatory Nagar Palika parishad, Ballia