Infrastructure Development in DEI

(Last 5 years – 2012 to 2017)

(2)

Infrastructure Development ( last five years - 2012 to 2017 )

S. No. Name of Building Built - up Area Date of Source of Completion

(sq.meters) Completion Funds Cost

1 Women's Hostel ( Ground Floor ) 2128 22.02.2012 UGC (XI plan) 129.17 lacs

2 Women's Hostel ( First Floor ) 1866 28.02.2013 UGC (OBC) 141.97 lacs

3 Work's Department 805 28.02.2013 UGC (OBC) 105.91 lacs

4 Extn. Of DES Block 135 30.12.2013 UGC (OBC) 19.91 lacs

5 Extn. of Library (Faculty of Engg.) 486 15.02.2014 UGC (OBC) 80.04 lacs and UGC ( XI

plan)

6

Seminar Hall Complex cum

Continuing 1232 10.03.2014 UGC (OBC) 367.56 lacs

(3)

Women’s Hostel (Ground Floor)

Built - up Area 2128 sq.meters

Date of Completion 22.02.2012

Source of Funds UGC (XI Plan)

Completion Cost 129.17 lacs

(4)

Women's Hostel ( First Floor )

Built - up Area 1866 sq.meters

Date of Completion 28.02.2013

Source of Funds UGC (OBC)

Completion Cost 141.97 lacs

(5)

Women’s Hostel - II

(6)

Work’s Department

Built - up Area 805.00 sq.meters

Date of Completion 28.02.2013

Source of Funds UGC (OBC)

Completion Cost 105.91 lacs

(7)

Works Department

(8)

Extn. Of DES Block

Built - up Area 135.00 sq.meters

Date of Completion 30.12.2013

Source of Funds UGC (OBC)

Completion Cost 19.91 lacs

(9)

Hall in DES Block (First Floor)

(10)

Extn. Of Library (Faculty of Engg.)

Built - up Area 486.00 sq.meters

Date of Completion 15.02.2014

Source of Funds UGC (OBC) and UGC (XII Plan ) Completion Cost 80.04 lacs

(11)

Extn. Of Library ( F. o.Engg. )

(12)

Extn. Of Library ( F. o.Engg. )

(13)

Seminar Hall Complex cum

Continuing Education Faculty Hostel

Built - up Area 1232.00 sq.meters Date of Completion 10.03.2014

Source of Funds UGC (OBC) and UGC (XI Plan) Completion Cost 367.56 lacs

(14)

Seminar Hall Complex

(15)

Seminar Hall Complex

(16)

Extn. Of Botany Department

Built - up Area 311.00 sq.meters

Date of Completion 20.03.2014

Source of Funds UGC (XI-Plan)

Completion Cost 40.01 lacs

(17)

Extn. Of Botany Department Building

(18)

Extn. Of Multimedia

Built - up Area 486.00 sq.meters

Date of Completion 31.08.2014

Source of Funds UGC (OBC)

Completion Cost 222.16 lacs

(19)

Extn. Of Multimedia Building

(20)

Information and Communication Technology Building

Built - up Area 1187.00 sq.meters

Date of Completion 22.08.2015

Source of Funds UGC (OBC) Completion Cost 209.87 lacs

(21)

Information and Communication

Technology Building

(22)

Multipurpose Gymnasium

• Built up Area - 702.00 sq.meters

• Date of Completion - under construction

Source of Funds - 1.0 crores (UGC)

Balance – own resources Expected Completion Cost – 148.55 lacs

(23)

Multipurpose Gymnasium

(24)

Bamboo Creche

• Built up Area 369.00 sq. Meters

• Date of Completion under construction

• Source of Funds Non Govt. Funds

• Expected Completion

Cost Rs. 73.40 lacs

(25)

Bamboo Creche

(26)

Miscellaneous Works

Ramps for the aid of handicapped and old persons have been added in all the buildings.

Water Harvesting wells have been provided at various low lying places which help in harvesting most of the rain water.

Roads of the Institute have been repaired and provided with a layer of premix Bituminous Carpet

Separate Toilet blocks for boys and girls have been provided in all the Faculties.

(27)

Ramps

(28)

Additions and Alterations

Main Buildings renovated are :- 1. Erstwhile Tannery Complex 2. DEI Dairy

3. DEI Shop

4. Hall for B Voc Apparel Design

(29)

Erstwhile Tannery Complex

• Our erstwhile Tannery Complex having

covered area of 2697.00 sq.meters have been renovated with minor additions and

alterations. It now houses various departments like –

• Distance Education

• CART

• Footwear Technology

• Renewable Energy (under B Voc courses)

(30)

DEI Leather Working School in Tannery

Complex

(31)

CART in Tannery Complex

(32)

DEI Dairy

(33)

DEI shop

(34)

Hall for B Voc Apparel Design

References

Related documents

In Banwarilal Jhunjhun Vs Union Of India(1963), it was held that the expression ‘every distinct offence’ has a different content from the expression ‘every offence’ or

Following candidates have been short listed for the Written Test for appointment on the post of Chair Side Attendant, Faculty of

At some sites wherever incinerators have been provided or incinerators proposed to be installed, huge quantum of incinerable hazardous wastes (organic wastes) have been

Of the various water supply options that have been endorsed by the National Policy for Arsenic Mitigation of 2004 for use in arsenic-affected areas, deep tube wells emerged as

Women and Trade: The Role of Trade in Promoting Gender Equality is a joint report by the World Bank and the World Trade Organization (WTO). Maria Liungman and Nadia Rocha 

• Water harvesting is the capture, diversion, and storage of water obtained from different freshwater sources for plant irrigation,.. domestic purposes, industrial purposes,

(iii) In such areas, the existing and new users of ground water (both private and government) shall have to mandatorily adopt the area specific rain water

The structure activity relationship of the compounds revealed that the compounds 3h having trimethoxy group present on benzohydrazide with chloro on pyridyl have