• No results found

Operating Environment

N/A
N/A
Protected

Academic year: 2022

Share "Operating Environment "

Copied!
26
0
0

Loading.... (view fulltext now)

Full text

(1)

STANDARDS REQUIRED FOR SAFETY &

SECURITY OF ARMY PERSONNEL

MGO BRANCH

सत्यमेवजयते

(2)

Operating Environment

OPERATING ENVIRONMENT

EN ACTION

INDIA & ABROAD

EXTREME WEATHER (DESERTS TO GLACIER + 50 C TO -50 C )

DIVERSE RANGE OF OPS (AIR , NBC, AMPHIBIOUS, SHAA) TRN FRICTION (JUNGLES,

RIVERS, DESERTS, SHAA)

NATURAL DISASTERS

ANY DILUTION OF SAFETY & SECURITY STANDARDS UNACCEPTABLE

(3)

सत्यमेव जयते सत्यमेव जयते

12/01/16

(4)

सत्यमेव जयते सत्यमेव जयते

(5)

सत्यमेव जयते सत्यमेव जयते

08/01/2016

(6)

सत्यमेव जयते सत्यमेव जयते

08/01/2016

(7)

सत्यमेव जयते सत्यमेव जयते

(8)

सत्यमेव जयते सत्यमेव जयते

(9)

सत्यमेव जयते सत्यमेव जयते

“ THE LAND IS SO BARREN AND THE PASSES SO HIGH THAT ONLY THE FIERCEST ENEMIES AND THE BEST OF

FRIENDS WOULD COME VISITING ”

(10)

Aim

• TO ACQUAINT THE

INDUSTRY WITH SAFETY &

SECURITY STANDARDS OF TEXTILES FOR THE ARMY

AIM

(11)

Operating Environment

Expenditure on procurement of Ordnance items – Rs 14,000 Crores

Approx 22% - Rs 3,000 Crores for Clothing & General Stores

Offload 48 principle items - Ordnance Factory Board to Trade

Boost to domestic Industry & impetus to ‘Make in India’

BUDGETARY ESTIMATES

(12)

SPECIAL CLOTHING & MOUNTAINEERING EQUIPMENT (SCME) :

APPROX STRENGTH - 40,000

58 x ITEMS, Cat I – 21 & Cat II – 37 ITEMS

ABOVE 12,000 FT

GLACIATED TRN

MINUS 30 TO MINUS 50O C

HIGH WIND CHILL FACTOR (40 KM/HR)

EXTREME COLD CLOTHING (ECC)

APPROX STRENGTH – 6 LAKHS

30 x ITEMS, Cat I – 13 & Cat II – 17 ITEMS

BETWEEN 6000 – 12,000 FT

PLUS 10 TO MINUS 10O C

TYPES OF CLOTHING ITEMS

सत्यमेवजयते सत्यमेवजयते

(13)

LIFE CYCLE CLOTHING ( LCC)

APPROX STRENGTH – 12 LAKHS

37 + 5 x ICK ITEMS

NORMAL USE ITEMS

PROTECTIVE EQPT

BPJs , BALLISTIC HELMETS , ELBOW & KNEE PADS TENTS ( NORMAL / ARCTIC )

SDE

MEDICAL TEXTILES

TYPES OF CLOTHING ITEMS

सत्यमेव जयते सत्यमेव जयते

(14)

EXAMPLES OF SCME ITEMS

Multi layered Extreme Cold Weather Clothing System (ECWCS)

JD TD

Sleeping Bags

Socks Wollen Spl Two Layer

Modular Gloves ( three layers )

High Quality Mountaineering Eqpt : Slithering ropes, Ice Axe, Pitons, Carabiners etc

Avalanche Survival Eqpt : Full Safe, Tugger etc

Under Slung Cargo Nets

Flexible & Multi Layered Footwear incl socks*

(15)

STANDARDS REQUIRED FOR SOCKS WOLLEN ( TWO LAYER) : SHAA

Meant for extreme cold / widest rg of climatic condition upto minus 50 C

Should regulate body temp to keep warm in the

winter and cool in the summer

Should absorb & evaporate moisture in the vapour state keeping feet dry

Should prevent moisture build up, bacteria growth &

odour

Tech Details viz bursting str, composition, colour

fastness, No of needles used, fineness of wool grade,

pH of aqueous extract etc spelt out in detail

(16)

Collective Protection, Tentage &

Load Carrying Fabrics

Under slung carriage ropes

Buildtech & latest tentage techniques

Semi permanent living

Fire resistant tents, Parachutes, NBC

Protection & Synthetic Camouflage Nets

(17)

BUILDTECH FABRICS ( E-in-C Br)

Architectural Membranes

Concrete Canvas Tarpaulins

Awnings and Canopies Floor & Wall Coverings

Scaffolding Nets

Fibre Reinforced Concrete (earthquake proof & faster construction)

Signages

Bunkers, Drains, Retaining Walls, A/Tk Barriers

(18)

MEDICAL TEXTILES AND PROTECTIVE CLOTHING

( DGMS DTE )

Bandages - Blood Clot (Life Saving)

Lightweight Stretchers

Healthcare & Hygiene Products

Extracorporeal

(19)

GEO & BUILDING TEXTILES ( E-in-C Br)

BRO and Combat Engineers for Roads, Bridges, Tunnels, Helipads, Air Fields, Drains & Canals

Expansion due to Heavy Requirement

Poor condition of Roads in remote areas

Threat of Landslides

Geo Textiles for prevention of landslides by Border Roads Organization

Road & Track Building Material

(20)

FRAMING OF STANDARDS & PROCUREMENT

(21)

FRAMING OF STDS

Iden of PI /New Eqpt Defining user reqmts(GSQR

/ Draft Specifications) RFI / Vendor Interaction

User trials as per Trial Directives( Sample on NCNC)

Selection of product &

finalization of specifications (Mil Specs-DGQA/Normal

Items - Proc Agency) Procurement

(22)

PROCUREMENT CYCLE

Request for Proposal (RFP)

Pre Bid meeting (Maj Procurements Only) Bid Submission and Opening

Tech Evaluation of Bid : User trials &

formulation of Tech Specs by DGQA ( Lab tests if required )

Commercial Bid Opening and Cost Negotiation

Placing of Supply Order - 80 : 20 for expanding vendor base, STE / LTE : GTE,

Apportionment

Time Bound Delivery under QA Cover

(23)

WAY AHEAD

Procurement Manuals DPP

& DPM available on net

Off loading 48 Non Core items from OFB to Trade

Simplification of Spec formulation and Contracts

3rd ITTA Seminar : 23 - 24 May 17 at New Delhi

Regular Vendor Interactions

/ RFI - for Product Improvement

RECENT DEVELOPMENTS

 Transparent Proc Procedures - e-proc

 ‘Make in India’, JVs, R &

D & Product Improvement

 Level playing field vis-a- vis foreign players

 Facilitate Make in India :

80:20, STE / LTE : GTE, Apportionment, Shift mfr base

 Close interface between the Services and Industry

KEY FOCUS AREAS

Make in India

GeM

Ease of Doing Business

Joint Ventures

FDI infusion - Technology transfer

Enhanced interactions

between Armed Forces & Industry

Improved R&D Facilities

Transparent e- proc Procedures

ENABLERS

(24)

Conclusion

Intro of Technical Textiles into the Army – Need of the hour

Enhanced Comfort level & Combat efficiency

Formulation of Standards & QA

Ensure High Stds of safety & security

Cooperation - Armed Forces & Industry ; Win : Win Situation

CONCLUSION

(25)

CDs WITH TECH SPECS FOR IA GIVEN TO THE ORGANISERS

Col P Acharya

Dir EM (Special Clothing)

Room No 206, A Wing Sena Bhawan New Delhi-110011

Ph No 011-23015934 Fax- 011-23015934

Email- diremgsc-mod@nic.in

Col Soumit Pattnaik Dir GS&C

Room No 623, A Wing Sena Bhawan Ph No and Fax 011-23018894

Email- diremgsc-mod@nic.in

CONTACT DETAILS

सत्यमेव जयते सत्यमेव जयते

(26)

27

References

Related documents

2) If it is network paralysis, then increase the number of neurons in the hidden layer. Problem: How to configure the hidden

All the required Air pollution Control systems will be provided in the proposed plant. The treated effluent will confirm to the Chhattisgarh Environment Conservation Board’s

In the most recent The global risks report 2019 by the World Economic Forum, environmental risks, including climate change, accounted for three of the top five risks ranked

Table 5.10: Cold fluid temp variation from inlet to outlet after 60 sec for counter flow cases The above two graphs show increase in temperature rise for cold fluid for both

For laboratory investigations required in the preparation of Indian Standards the Institution continued to receive active cooperation and assistance from all

However, the crosstalk minimization problem for two-layer routing, both in case of simplest as well as general channel instances are NP-hard [6], i.e., there exists no polynomial

In another work, two differently sized silica nanoparticles (20 nm and 50 nm) were synthesised for developing transparent superhydrophilic films using

An attempt has been made to analyse, mathematically and numerically, the various conditions of evaporative cooling for a CEA system, the effect of water flowing